Get updates
Preferences
Expand group
Core Network
Datacentre Services
Wholesale Connectivity - Operational
Wholesale Connectivity
During this window we will be performing upgrades to our core router in Digital Realty/Interxion LON1.
This maintenance requires a full power down of the device to install new control boards and routing-engines into the device running new JUNOS.
Customers with services fed directly from core1-ixn will experience an outage of approximately 30 minutes during this window.
Other external connectivity such as peering and transit will be re-routed to alternative paths cleanly before the outage.
Start time: Friday 27th June 2025, 01:00AM BST
End time: Friday 27th June 2025, 03:00AM BST
This is a reminder of the below planned maintenance taking place today (07/05/2025).During this window contractors will be performing planned maintenance and performing a load bank test on the backup Generator systems in VeloxServ DC1 and DC2 in Wolverhampton.
No notices reported this month
Previous
Apr 2025 to Jun 2025
Next